Blog Disclaimer: The content provided on this website is for informational purposes only and is not legal advice. Transmission of this information is not intended to create, and receipt does not constitute, an attorney-client relationship. The information provided is intended for general information which may or may not reflect the most current developments. Read More

- OR -

Sanctions of $1.6 Million Plus Imposed on Contractor for Fabricating Evidence

Date: March 8, 2017  /  Author: Paul R. Cressman, Jr.  /  Categories: Out of the Ordinary, Construction News and Notes, Memorable Quotes, Rants and Raves, Damages, Claims  /  Keywords: Sanctions of $1.6 Million Plus Imposed on Contractor for Fabricating Evidence 1  /  Comments (0)

King County Superior Court issued sanctions of $1,641,721 in favor of Gefco and against Cascade Drilling, Inc. and its President, Bruce Niermeyer, composed of $1,394,435 in attorneys’ fees and $247,286 in expert fees.

Cascade Drilling is a contractor.  Gefco manufactures and sells large drilling machinery.  The dispute centered around a project that began in 2008.  Cascade was hired to drill a water well at a housing development in Wheeler Canyon, California.  Cascade used a 50K drilling rig purchased from Gefco.  The pump drive shafts on the drilling rig failed four times.  After each failure, Cascade ordered a replacement pump drive shaft from Gefco.